Pole Lead Time Pressures Are Easing
Acuity strives to provide updates to keep you in the loop as the supply chain normalizes. For steel and aluminum poles, lead times have fluctuated over recent months due to hiccups in raw material sourcing.
Steel Poles: Lead times have been reduced from 10–12 down to 8 weeks.
Aluminum Poles: Many configurations have been reduced to 8 weeks from the current 11-week lead times. Due to variables with aluminum pole lead times, including pole type and ship-to location, please consult the EST SHIP DATE on the order for your specific aluminum pole’s lead time as it may differ from what is shown in AGILE.
For other questions or concerns, please contact our Poles Product Manager:
Elaine Boone | Elaine.Boone@AcuityBrands.com